Project
Aims and Objectives
The overall objective, target groups and result indicators of the approved logical framework.
To increase the resilience, productivity and environmental sustainability of the local agri-food system in Yenişehir against climate risks, through a university-developed and hosted digital early warning and decision support infrastructure, multi-actor partnerships and inclusive services.
Impact indicator
At least 25% reduction in climate-related crop losses on pilot farms.
Target groups
About 1,200 farmers and cooperative members producing climate-sensitive crops; agricultural cooperatives; municipal units.
Three result areas and their indicators
Institutionalised digital governance
Municipal units, cooperatives and the university continuously use the platform – integrating real-time climate data, farmer profiles and decision modules – in planning and budgeting.
- At least 80% of municipal units use the platform regularly.
- At least 60% of farmers adopt two or more climate-smart practices.
- At least 5 farmer typologies and 250 individual input plans are prepared.
Anticipatory risk management
Farmers and cooperatives adopt early warnings and co-developed response procedures and take timely protective action against drought, frost and heatwaves.
- At least 60% of alerted farmers change their practices.
- Risk protocols are approved in at least 10 cooperatives.
- At least 4 hazard-specific standard operating procedures (SOPs) are prepared.
Institutional sustainability
A Climate-Resilient Agriculture Coordination Office is established within the municipality, staff are trained and a participatory governance framework secures the continuation of the service after the project.
- At least 80% of municipal units integrate the platform into planning.
- The five-year sustainability plan is approved by the municipal council.
- At least 200 users; 90% of helpdesk requests resolved within 48 hours.
Target values are based on the project’s approved logical framework (Annex C); achieved values are updated in the interim and final reports. Work packages →






